Thursday, January 5, 2012

Project Pics

Bunker construction - The boards are staked to create a lip and hold the soil back on the high side of the bunker.

 Drain line trenched from the bunker to the creek was very long, another option would have been to dig a large catch basin out of play and drain into the basin backfilled with gravel.
Bunker before drain lines are cut and sand added.
Drainage along a cartpath in a low-lying area, several of these have been installed on #11 and 12.
We hope everyone had a very good Christmas and New Year and got to spend time with your loved ones. We look forward to a very good year at the golf course and hope everyone has a prosperous year as well!

T&A Turf is here to begin the back 9 irrigation project today, this will last the next few weeks and will include installation of all new heads, control wire, and satellites. The disruption to play will be minimal so come out and enjoy the beautiful weather!