Jacobsen aerifier for fairways, tees, rough with blades on it. Dont want to get in its way!

Earl blowing off thatch after the verticutter

After sanded and dragged in

Holes and verticuts before sand
Aerification is complete and the greens have healed nicely. The weather cooperated and everything went smooth. The greens will be slow for awhile as they are growing and healing. We solid tined the greens and came behind with a deep verticut to remove thatch. We used less sand because of this and the greens are less bumpy also due to this.

The stretch of weather we are in is more like a late April-early May pattern and the bermuda is greening up rapidly. We have to avoid a late season freeze which would set things back. Overall, its looking like a great spring to get out and play golf. We just hope summer isnt in a hurry to get here and we get some more needed rainfall before the heat hits.

Thursday, March 1, 2012

Front Sign Paint Job

Both signs entering the course have been repainted. Here is a picture of the before/after of the sign along Rupe. The job was very tedious to get the lettering and borders just right and Bill did a great job.

 Before paint

After paint

Spring

March is here, but the weather has felt like April and the bermudagrass is showing signs of life as it begins to get some green color. The course has been sprayed with preemergent herbicide and aerification is next Monday and Tuesday. We have been busy building, painting, grinding, trimming, etc. More than a dozen trees have been removed for various reasons. As always, there are numerous irrigation leaks showing up and being worked on.

We are looking forward to the golfing season and hoping for a mild summer and hope the course will continue to improve with the sprinkler heads all functional.

One thing that causes much detriment to the course that we want to address this year is cart traffic. Golf carts cause much compaction and lead to bare or thin areas with weed encroachment likely and hard playing surfaces. PLEASE keep carts on paths as much as possible and always around greens and tees! Use the 90 degree rule when coming onto the fairways. Watch where you drive and try not to drive in the same path as the rest of the cart traffic, this is the direct cause of the large bare areas on #4 and #10 near the cartpath by the green. Everyone can help by following these rules, including our maintenance staff. Thank you for you help!

Wednesday, February 1, 2012

The irrigation install project is complete and went great with the nice weather we have had. We now will have all the sprinklers functioning on the course, including the driving range. Thanks to T&A Irrigation and all their workers for the quality install and all of their help.


Its getting close to spring, our preemergent applications are under way and aerification is about a month out as well. We have had a great winter for golf and were due for a mild one after the last couple nature has dished out.
Bunker with sand added, irrigation install going on also

Lance using the sandpro to pack in the sand

Thursday, January 5, 2012

Project Pics

Bunker construction - The boards are staked to create a lip and hold the soil back on the high side of the bunker.

 Drain line trenched from the bunker to the creek was very long, another option would have been to dig a large catch basin out of play and drain into the basin backfilled with gravel.
Bunker before drain lines are cut and sand added.
Drainage along a cartpath in a low-lying area, several of these have been installed on #11 and 12.