This blog is designed to provide our customers access to information about course conditions, weather, ongoing projects as well as maintenance practices/philosophies and educational information.
Thursday, January 5, 2012
Project Pics
Bunker construction - The boards are staked to create a lip and hold the soil back on the high side of the bunker.
Drain line trenched from the bunker to the creek was very long, another option would have been to dig a large catch basin out of play and drain into the basin backfilled with gravel.
Bunker before drain lines are cut and sand added.
Drainage along a cartpath in a low-lying area, several of these have been installed on #11 and 12.
No comments:
Post a Comment